The 10 Golden Rules
- Verify ABSoW matches PSoW. Count every installed unit. Flag discrepancies immediately.
- Photograph EVERY unit. Minimum 2 photos per installed unit unless otherwise noted. Wide + close-up.
- Include a reference object (tape measure, level, hand) for scale in at least one photo per product type.
- Capture labels and markings. Manufacturer stamps, model numbers, batch/lot IDs. If visible, photograph it.
- Measure spacing. Any product with "FT o.c." or "IN o.c." — tape measure between units, photo the tape.
- Shoot wide context first. Before close-ups, get a wide shot showing the overall installation area and its relation to the structure.
- Drive logs are MANDATORY for piers. Push, helical, and slab piers require drive logs — handwritten or digital. Cert will not generate without them.
- Clean lens, good lighting. Flash in crawlspaces. No blurry shots. Re-take if you can't read labels in the photo.
- Note deficiencies. Missing hardware, improper installation, structural concerns — document with photos AND written notes.
- Upload same day. Photos and logs submitted within 6 hours of site visit. Escalation triggers at T+6hr, T+24hr, T+48hr.
01
Underpinning Systems (UND)
UND-PUSH
Push Pier
SSI
Drivelog
Required Addon: Backfill (ADD-BKFL)
Default Spec
Supportworks Pro PP288, 2.875" tube dia, 68,000 lbs capacity
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Bracket & First Section — pier bracket secured to footing with first tube section visible | Required — 1 per pier |
| 2 | Final Depth / Completion — full pier assembly at final driven depth | Required — 1 per pier |
| 3 | Pier Spacing (Wide Shot) — multiple piers along wall with tape measure for spacing | Required — 1 per wall run |
| 4 | Manufacturer Label — close-up of stamps, model numbers, batch IDs | If visible |
Measurements
Checklist
- Bracket flush to footing
- All bolts installed and tight
- Pier plumb
- Backfill area clear
- No cracked tubes
- Lift indicators checked
Drive Log Fields
- Pier number
- Date driven
- Number of tubes per pier
- Total depth (ft)
- PSI reading per tube section
- Final PSI at refusal
- Extension sleeve used (Y/N)
- Rated capacity
UND-HELI
Helical Pile
SSI
Drivelog
Required Addon: Backfill (ADD-BKFL)
Default Spec
Supportworks HP288, 8"-10"-12" triple helix, 2.875" shaft dia
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Helical Head & Bracket — helix plates visible, connection hardware clear | Required — 1 per pier |
| 2 | Final Installation — bracket, shaft, extension hardware | Required — 1 per pier |
| 3 | Spacing Wide Shot — tape measure for center-to-center | Required — 1 per wall run |
| 4 | Torque Reading / Equipment — torque readout if available | If available |
Measurements
Checklist
- Bracket flush
- Bolts tight
- Pier plumb
- Helix plates not damaged
- Proper torque
- Backfill ready
Drive Log Fields
- Pier number
- Date installed
- Helix configuration
- Total depth (ft)
- Torque readings at each 1-ft increment
- Final torque at termination (ft-lbs)
- Extension used (Y/N)
- Rated capacity
UND-SLAB
Slab Pier
SSI
Drivelog
Required Addon: Slab Patch (ADD-SLAB)
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Core Hole & Bracket — core hole with bracket on footing | Required — 1 per pier |
| 2 | Final Pier Assembly — full pier at final depth | Required — 1 per pier |
| 3 | Spacing (Wide) — multiple slab piers with spacing | Required — 1 per area |
Measurements
Checklist
- Core hole clean
- Bracket seated
- Pier plumb
- No slab damage beyond core
- Patch area prepped
Drive Log Fields
- Pier number
- Date driven
- Number of tube sections
- Total depth (ft)
- PSI per section
- Final PSI
- Core hole diameter
- Rated capacity
02
Anchor Systems (ANC)
ANC-WALL
Wall Anchor
SSI
Required Addon: Backfill (ADD-BKFL)
Default Spec
16x16 in interior plate, 12x12 in earth plate, 0.75" dia galvanized rod, 8-12 ft length
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Interior Wall Plate — all 4 corner bolts and center nut visible | Required — 1 per anchor |
| 2 | Wide View — All Plates — all plates along wall with spacing | Required — 1 per wall |
| 3 | Exterior Earth Anchor — before backfill | If accessible |
Measurements
Checklist
- 4 corner bolts installed
- Center nut tightened
- No wall cracking at plate
- Plate level
- Rod angle 10-15 degrees
ANC-CHAN
Channel Anchor
SSI
Required Addon: Backfill (ADD-BKFL)
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Channel Assembly on Wall — flush against wall, top and bottom anchoring visible | Required — 1 per anchor |
| 2 | Wide View of All Channels — all channels with spacing | Required — 1 per wall |
Measurements
Checklist
- Channel flush
- Top and bottom anchored
- No cracking
- Corrosion coating intact
03
Bracing Systems (BRC)
BRC-CFRP
CFRP Strap
SSI
Default Spec
Fortress Stabilization, 12" width, 32,000 psi tensile, two-part epoxy
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Individual Strap Close-up — full epoxy saturation, no bubbles | Required — 1 per strap |
| 2 | Wide Wall View — all straps with spacing | Required — 1 per wall |
| 3 | Termination Detail — top and bottom termination points | Recommended |
Checklist
- Full epoxy saturation
- No bubbles/wrinkles
- Strap plumb
- Terminations anchored
- Wall surface prepped
BRC-STEEL
Steel Brace / IntelliBrace
SSI
Default Spec
W4x13 Steel I-Beam, floor & sill plate brackets, bolted connections
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Brace Assembly — floor anchor to top connection, plumb | Required — 1 per brace |
| 2 | Wide Wall View — all braces along wall | Required — 1 per wall |
| 3 | Floor Anchor Detail — anchor bolt and base plate | Recommended |
Checklist
- Brace plumb
- Floor anchor bolts tight
- Top connection secure
- Adjustment accessible
- No rust/damage
BRC-PIN
Wall Pin
Default Spec
Galvanized steel pin
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Pin Heads Visible — pins in mortar joints with consistent spacing | Required — 1 per section |
| 2 | Wide Wall View — full wall section | Required — 1 per wall |
Checklist
- Pins in mortar joints (not brick)
- Consistent spacing
- No cracking
- Flush or slightly recessed
04
Support Systems (SUP)
SUP-COL
Adjustable Column / IntelliJack
Default Spec
Supportworks IntelliJack, 24,000 lbs load rating
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Column Height — plumb | Required — 1 per column |
| 2 | Top Bearing Contact — cap making positive contact with beam/floor | Required — 1 per column |
| 3 | Base/Footer Connection — column base on footer pad | Required — 1 per column |
Checklist
- Column plumb
- Positive bearing at top
- Base centered on footer
- Threads not maxed
- No damage
SUP-SBM
Steel Beam
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Beam Run — end to end | Required — 1 per beam |
| 2 | Bearing Point Detail — each bearing point | Required — 1 per end |
| 3 | Beam Markings/Label — manufacturer markings | If visible |
Measurements
Checklist
- Beam level
- Adequate bearing (min 3" on masonry)
- Joists connected
- No damage/deformation
SUP-LBM
Lumber Beam
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Beam Run — end to end with bearing points | Required — 1 per beam |
| 2 | Bearing Point Detail — each end bearing | Required — 1 per end |
| 3 | Grade Stamp — grade stamp and treatment marking | If visible |
Checklist
- Beam level
- Adequate bearing
- Pressure-treated on masonry
- No splits/cracks
- Grade stamp visible
SUP-FJ
Floor Joist
Includes sistered joists. Note execution type (new, sister, repair).
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Installed Joist — full length; for sistered, show both | Required — 1 per joist/group |
| 2 | Connection Detail — joist hanger, nailing, bearing connection | Required — 1 per joist |
| 3 | Wide Context — layout and spacing | Required — 1 per area |
Checklist
- Proper bearing
- Joist hangers nailed
- No defects
- Correct spacing
- Pressure-treated where required
SUP-RJ
Rim Joist
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Installed Rim Joist — fastening visible | Required — 1 per section |
| 2 | Connection to Sill/Floor — how it connects to sill plate and floor joists | Required — 1 per section |
Checklist
- Proper fastening
- No rot/insect damage
- Pressure-treated on masonry
- Sealed at exterior
SUP-SP
Sill Plate
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Installed Sill Plate — on foundation wall with anchor bolts | Required — 1 per section |
| 2 | Anchor Bolt Detail — spacing and washers/nuts | Required — 1 per section |
Checklist
- Pressure-treated lumber
- Anchor bolts per spec
- Sill sealer present
- No defects
- Level
SUP-BB
Band Board
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Installed Band Board — fastening and adjacent framing | Required — 1 per section |
| 2 | Connection Detail — nailing or bolting | Recommended |
Checklist
- Proper fastening
- No rot/insect damage
- Tight to joists
- Pressure-treated where required
SUP-SF
Subfloor
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Installed Subfloor — panels, fastening pattern, seam layout | Required — 1 per area |
| 2 | Fastening Detail — screw/nail pattern and adhesive | Recommended |
Checklist
- Glue+screw preferred
- Seams staggered
- No soft spots
- Tight to joists
- No squeaks
SUP-FCIP
Pier Footer — Cast-in-Place
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Footer with Column — column/post seated on footer | Required — 1 per footer |
| 2 | Footer Dimensions — tape measure for dimensions | Required — 1 per footer |
| 3 | Excavation/Aggregate — excavation depth and aggregate before pour | Recommended |
Measurements
Checklist
- Footer level
- Proper dimensions
- Column centered
- Adequate aggregate base
- Below frost depth
- No cracking
SUP-FPRE
Pier Footer — Precast
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Footer with Column — precast footer with column/post | Required — 1 per footer |
| 2 | Footer Dimensions — tape measure | Required — 1 per footer |
Checklist
- Footer level
- Proper dimensions
- Column centered
- No cracking
- Bearing surface solid
05
Foundation Systems (FND)
FND-WALL
Foundation Wall
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Wall Run — Wide — full wall run with dimensions | Required |
| 2 | Wall Thickness — thickness measurement | Required |
| 3 | Rebar/Reinforcement — visible reinforcement | If accessible |
Checklist
- Wall plumb
- Proper thickness
- Rebar properly spaced
- No defects
FND-FTR
Continuous Footer
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Footer in Trench — before backfill | Required |
| 2 | Footer Dimensions — width and thickness with tape | Required |
| 3 | Rebar Layout — reinforcement before pour | If accessible |
Checklist
- Footer level
- Proper dimensions
- Reinforcement visible
- Clean bearing
FND-GSLAB
Grade Slab
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Slab View — complete slab-on-grade | Required |
| 2 | Thickness/Edge Detail — thickness at edge or control joint | Required |
| 3 | Reinforcement/Mesh — wire mesh or rebar before pour | If accessible |
| 4 | Control Joints — layout and spacing | Recommended |
Checklist
- Level and flat
- Proper thickness
- Control joints cut
- No extra cracking
- Reinforcement in place
FND-SSLAB
Structural Slab
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Slab View — complete structural slab | Required |
| 2 | Thickness Measurement — with tape measure | Required |
| 3 | Rebar Layout (Pre-Pour) — rebar grid with spacing | Required if accessible |
Checklist
- Proper thickness
- Rebar spacing per plan
- Adequate cover
- No defects
- Cure time noted
FND-BKFL
Foundation Backfill
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Completed Backfill — grade restored, sloped from foundation | Required |
| 2 | Compaction — equipment/method | Recommended |
Checklist
- Grade restored and sloped away
- Properly compacted
- Clean fill
- No settlement
FND-PORCH
Porch
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Porch View — complete with building connection | Required |
| 2 | Footing/Support Detail — footings or support piers | Required |
| 3 | Connection to Structure — ledger board, through-bolts | Required |
Checklist
- Level
- Proper connection
- Adequate footing
- Drainage slope
- Railing if 30"+
FND-STOOP
Stoop
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Stoop View — stoop with steps and landing | Required |
| 2 | Footing/Base — footing or base connection | Required |
| 3 | Railing — if above 30" | If applicable |
Checklist
- Level landing
- Proper drainage
- Uniform rise/run
- Connection solid
- Railing at code height
FND-AREAWAY
Areaway
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Areaway View — including walls and drain | Required |
| 2 | Drain/Waterproofing — drain connection and waterproofing | Required |
| 3 | Wall Connection — areaway to foundation | Recommended |
Checklist
- Proper drainage
- Waterproofing at connection
- Structural connection
- Grate/cover in place
FND-WTR
Exterior Waterproofing
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Membrane Applied — on foundation wall before backfill | Required |
| 2 | Drainage Board — over membrane | Required if in scope |
| 3 | Footer Drain — perimeter drain at footer before backfill | Required if in scope |
Checklist
- Full coverage footer to grade
- Proper adhesion
- Sealed at seams
- Drainage board over membrane
- Footer drain sloped
FND-PIER
Foundation Pier
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Pier in Excavation — depth and diameter | Required — 1 per pier |
| 2 | Reinforcement — rebar cage before pour | Required if in scope |
| 3 | Connection to Footer — pier to footer/grade beam | Required — 1 per pier |
Checklist
- Proper depth
- Reinforcement in place
- Clean bearing
- Connection secured
- No cave-in
06
Water Management Systems (WTR)
WTR-BSMT
Basement Water Management
Parent
Required Addons: Slab Patch (ADD-SLAB) + WallSeal (ADD-WSEAL)
Default Spec
1/3 HP pump, battery backup, sealed basin, check valve, PVC discharge 6+ ft
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Drain Channel/Gutter — joint connections and slope | Required |
| 2 | Sump Pit & Pump — float switch and discharge | Required |
| 3 | Discharge Line — exit point 6+ ft from foundation | Required |
| 4 | Wide System View — overall layout | Required — 1 per area |
Checklist
- Drain sloped
- Pit adequate size
- Float switch free
- Check valve installed
- Discharge 6+ ft
- No standing water
WTR-CRWL
Crawlspace Water Management
Parent
Default Spec
Sealed basin, PVC discharge, drain mat for crawlspace
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Drain Tile Layout — USE FLASH | Required |
| 2 | Sump Pit & Pump — float switch and connections | Required |
| 3 | Exterior Discharge — discharge point | Required |
Checklist
- Drain sloped
- Pit adequate
- Float switch free
- Check valve
- Discharge clear
- USE FLASH
07
Encapsulation Systems (ENC)
ENC-SYS
Encapsulation System
Default Spec
20-mil reinforced poly vapor barrier, pressure-sensitive tape, commercial dehumidifier with condensate routing
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Encapsulation View — multiple angles, USE FLASH | Required — multiple |
| 2 | Seam Detail — overlaps and tape joints | Required |
| 3 | Wall Attachment — barrier attachment to foundation | Required |
| 4 | Dehumidifier — with drainage visible | Required if in scope |
| 5 | Rigid Insulation — panels on walls | Required if in scope |
| 6 | Pier/Column Wrapping — barrier around piers/columns | Recommended |
Checklist
- Complete coverage
- Seams overlapped/taped
- Sealed around penetrations
- Dehu draining
- Insulation tight
- No water beneath
- Vents sealed
08
Retaining Wall Systems (RTW)
RTW-WALL
Retaining Wall
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Wall Elevation — end to end with full height | Required |
| 2 | Wall Thickness/Section — construction and thickness | Required |
| 3 | Rebar/Reinforcement — before pour or visible | If accessible |
Checklist
- Wall plumb
- Proper construction
- Rebar spaced
- Cap sealed
- No defects
RTW-FTR
Retaining Wall Footing
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Footing in Trench — rebar and dimensions visible | Required |
| 2 | Footing Dimensions — tape measure showing W x T x D | Required |
Checklist
- Footer level
- Proper dimensions
- Reinforcement spaced
- Adequate depth
- Clean bearing
RTW-BKFL
Retaining Wall Backfill
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Completed Backfill — proper grade behind wall | Required |
| 2 | Drainage Aggregate — granular backfill against wall | Recommended |
Checklist
- Compaction in lifts
- Drainage aggregate
- Grade restored
- No debris
RTW-WTR
Retaining Wall Waterproofing
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Waterproofing Membrane — on soil-facing side before backfill | Required |
| 2 | Drainage System — drain tile and drainage board | Required if in scope |
Checklist
- Full coverage
- Proper adhesion
- Sealed seams
- Drain tile sloped
- Drainage board in place
RTW-SOIL
Soil Bearing
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Bearing Surface — soil conditions at foundation level | Required |
| 2 | Test Equipment/Results — if available | If available |
Checklist
- Adequate capacity
- No soft spots
- Proper depth
- No water intrusion
- Soil type documented
RTW-RAIL
Railing
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Full Railing Run — complete installation | Required |
| 2 | Post Connection Detail — post to wall cap | Required |
| 3 | Height Measurement — tape measure, 42" code min | Required |
Checklist
- 42" minimum
- Posts secure
- No gaps >4"
- No wobble
- Corrosion-resistant
09
Addon Items (ADD)
ADD-BKFL
Backfill
Addon
Triggered by: UND-PUSH, UND-HELI, ANC-WALL, ANC-CHAN
Note: Anne Arundel County triggers Form 215
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Completed Backfill — grade restored, sloped away | Required when on SOW |
Checklist
- Grade restored
- Sloped away
- Clean area
- No debris
ADD-SLAB
Slab Patch/Repair
Addon
Triggered by: UND-SLAB, WTR-BSMT
Note: Anne Arundel County triggers Form 240
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Completed Patch — flush with surrounding slab | Required when on SOW |
Checklist
- Flush with slab
- No voids
- Clean finish
- Cure time noted
ADD-WSEAL
WallSeal
Addon
Triggered by: WTR-BSMT
Photos
| # | Description | Requirement |
|---|---|---|
| 1 | Applied Membrane — coverage and adhesion visible | Required when on SOW |
Checklist
- Complete coverage
- Proper adhesion
- Sealed at seams
- No gaps